Finding Water Management Solutions with High-Volume Pumps
High-volume Remko pump solution delivered on a tight timeline to support university flood research and large-scale water management testing.
The school required a new fire pump solution that:
Allflo was approached by a NSW plumbing contractor to design & supply a suitable fire pump system for the application.
Allflo engineered and supplied a complete fire pump package, designed to meet site requirements and compliance standards.
The solution included:
The enclosure provided protection from weather exposure, reduced vandalism risk, and prevented unauthorised access by students and visitors. Enclosures were supplied in Colorbond® finishes to suit the surrounding environment.

Despite border closures and logistical challenges during COVID-19, close coordination between Allflo and the plumbing contractor ensured the system was delivered, installed, and commissioned successfully.
The completed fire pump system provides the school with a compliant, secure, and reliable fire protection solution, offering peace of mind for staff, students, and visitors.
The client praised Allflo’s communication, pricing, and after-sales support, highlighting the smooth delivery of the project despite external challenges.
This project demonstrates Allflo’s capability to deliver fully compliant fire pump solutions for education and public infrastructure facilities.

High-volume Remko pump solution delivered on a tight timeline to support university flood research and large-scale water management testing.
Diesel auto-prime pump solution for a quarry sand wash plant, delivering high flow, low noise, and reliable performance in demanding site conditions.
Remko booster pump solution engineered to double water flow over a 16 km pipeline for a remote mining operation.