Improvements & Upgrades by Allflo
One of our large manufacturing clients reclaims high pressure super-heated steam condensate water. The special low NPSHR pump required, regularly...
Allflo had a client who needed to upgrade their submersible pumping system pumping run-off water back to the plant. The client wanted to be able to start and stop the pump remotely via an SMS system.
Allflo worked with the client to design a solution that allowed them to start the pump remotely via a simple SMS start system.
Due to the site’s lack of main power, Allflo supplied a diesel generator controlled by a custom-built electrical panel. The panel allows the pump to vary in speed depending on the alarm and to shut down with any loss of water to protect it from running dry.
While the new system was being manufactured, the client needed a pump to get them out of trouble and keep the plant operational.
Allflo supplied a Remko 4” auto-prime pump to fill the void. Our rental fleet means clients can have peace of mind that we have their backs and can keep them operational.
The total package included:
One of our large manufacturing clients reclaims high pressure super-heated steam condensate water. The special low NPSHR pump required, regularly...
Allflo were selected to be the supplier of choice to suply the pumping and filtration equipment to a new upgrade at a Regional Victorian...
1 min read
Allflo was called to site to scope a diesel pumping system for a local sand quarry. The solution had to be silenced due to the site office being...