title: Finding Water Management Solutions With Pumps – Allflo Pumps & Equipment
description: High-volume Remko pump solution delivered on a tight timeline to support university flood research and large-scale water management testing.
---

[Projects ](https://www.allflo.com.au/resources/projects)

# [Finding Water Management Solutions With Pumps – Allflo Pumps & Equipment](https://www.allflo.com.au/resources/projects/finding-water-management-solutions-with-pumps-2)

 Written by [Admin](https://www.allflo.com.au/resources/projects/author/admin) | Jun 18, 2019

> ### [Download Case Study](https://allflo.com.au/wp-content/uploads/2021/06/AllFlo-Case-Study-NSW-Uni.pdf)

##### Allflo Pumps & Equipment was engaged by a leading Australian **university water research laboratory** to deliver a short-notice, high-volume pumping solution to support critical flood-related water management experiments.

###### Following severe flooding events in North Queensland, the laboratory required a pump capable of moving extremely large volumes of water within a tight timeframe.

 

### The Challenge

The university initially sought to **hire** a large pump for the experiment.

However:

- The required capacity was significant
- The project timeline was limited to **one month**
- International researchers were already scheduled to attend
- Any delay would severely disrupt the program

Compounding the challenge, Allflo does not operate as a pump hire business.

 

### The Allflo Solution

Rather than decline the request, Allflo proposed an alternative approach: **design and manufacture a complete new pumpset within the client’s hire budget**, allowing the laboratory to retain the equipment for future research.

The selected solution was a **Remko RM 650-40**, featuring:

- **650 mm inlet and discharge**
- Capacity equivalent to **emptying an Olympic swimming pool (2,500,000 L) in approximately 42 minutes**
- Suitability for large-scale water movement and experimental testing

Detailed design, manufacturing and assembly were overseen in-house to meet the strict timeframe.

 

### Implementation

Due to the size and weight of the pumpset, Allflo coordinated:

- Special open-deck transport
- Crane logistics
- On-site positioning at the laboratory

All logistics were planned and executed to ensure on-time delivery.

 

### Outcome

Despite tight margins and time pressure, the pumpset was **delivered on time and within budget**. The university gained not only a solution for the immediate experiment but a long-term asset for future water research projects.

The laboratory’s senior engineering team commended Allflo for responsiveness, problem-solving, and post-delivery support.

This project highlights Allflo’s ability to deliver **engineered, high-capacity pumping solutions under extreme time and performance constraints**, particularly for research, flood response, and water management applications.

 

 

###### **Speak with Allflo to discuss large-scale or time-critical pumping requirements.**

[View full post](https://www.allflo.com.au/resources/projects/finding-water-management-solutions-with-pumps-2)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Admin"
  },
  "dateModified" : "2026-01-23T02:30:06.841Z",
  "datePublished" : "2019-06-18T03:00:00Z",
  "headline" : "Finding Water Management Solutions with High-Volume Pumps",
  "image" : {
    "@type" : "ImageObject",
    "height" : 536,
    "url" : "https://www.allflo.com.au/hubfs/NSW_Uni.jpg",
    "width" : 926
  },
  "mainEntityOfPage" : "https://www.allflo.com.au/resources/projects/finding-water-management-solutions-with-pumps-2",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Projects"
  }
}
```